Openings slip in the same four places: licences, equipment commissioning, trials and training. None of them sit on the fit-out programme. All four decide whether you open on the date you announced.
The work starts with the menu, not the floor plan. A kitchen sized to a menu can be costed, staffed and commissioned against something real. A kitchen sized to a drawing produces equipment nobody uses and stations nobody can reach at peak.
What is covered
- Kitchen layout and workflow signed off against the menu
- Equipment schedules, specifications and commissioning support
- Licensing and FSSAI documentation tracked alongside the fit-out
- Hiring grid, rosters and a training plan built to the opening date
- Recipe cards, SOPs and station checklists written before trials
- Mock service, trials and a day-one rehearsal with the full team
What you are left with
A kitchen that opens on the promised date, and the documentation to run it after I have gone: costed recipes, station checklists, a numbers baseline and a ninety-day review.
An opening date is not a finish line. It is the first day the systems meet real guests.


